Work Progress
The construction for Phase-I of new campus is under progress, in phase-I the institute aims to built following:
Admin Block (G+3), Academic Block(3 No's, G+3, 1 No. G+2, 1 No. S/S), Residential Block(T2/7 No's (G+3), T-4/7 No's (G+3)), Hostel Block (1+1/2 No's (G+3), Girls 1 No.(G+3)), Director Residence (G+1), Dining Block (1 No. S/S) and Utility Block (3 No. single/ double storey), including water supply, Sanitary Installations, Internal Electrical Installations, Roads, Drainage and Sewerage.
Work Progress as on 18-11-2015: